| Date: |
1-2-2009 |
|
| Number of Hours: |
6.50 |
|
| Brief Description: |
Top Skin |
|
|
I have now placed the pre drilled top skin. Leveling everything and ensuring no twists I lined up the spar and the lines through the pre drilled holes. Clecoed everything togethor. I will still need to do the bottom skin and then I can remove and disassemble evrything, deburr and corrosion protect and then rivet on the bottom skin only |
||