Date:    1-2-2009
Number of Hours:    6.50
Brief Description:    Top Skin
I have now placed the pre drilled top skin. Leveling everything and ensuring no twists I lined up the spar and the lines through the pre drilled holes. Clecoed everything togethor. I will still need to do the bottom skin and then I can remove and disassemble evrything, deburr and corrosion protect and then rivet on the bottom skin only