| Date: |
6-26-2017 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Transmission Preparation |
|
|
The transmission fittings were marked and removed in preparation for painting the transmission (except the one prefit fitting by Eagle R&D). The housing was painted with a chome aluminum paint that was designed for engine heat. Instead of masking off the bolts, everything was painted. At a later time, all the bolts will be replaced with new ones to give a cleaner look. |
||