| Date: |
6-10-2017 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Transmission Installation |
|
|
The transmission alignment was checked one last final time before drilling the second hole for the transmission mount with a #4 center drill. The transmission lift strut was assembled and installed per the new instructions. The pulley was set in place and the bolts were tightened to 35 inch/pounds.6 |
||