| Date: |
9-14-2016 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Assembled case halves (finally) |
|
|
Case hardware arrived after a 3 week wait...Case halves joined, permatex 3H liquid gasket, and locknuts. Ensured crank spun freely. Installed oil screen/plate/temperature sending plug. Installed oil pump,gaskets,cover. |
||