Date:    9-14-2016
Number of Hours:    1.50
Brief Description:    Assembled case halves (finally)
Case hardware arrived after a 3 week wait...Case halves joined, permatex 3H liquid gasket, and locknuts. Ensured crank spun freely. Installed oil screen/plate/temperature sending plug. Installed oil pump,gaskets,cover.