| Date: |
3-14-2012 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Assembly |
|
|
Start dry fitting. Andrew Pitman from aeroplane factory dropped in the missing #5 rib and control torque tube assembly. Still need to get the upper part of rib 3. Lower skin was rolled up into the box - a bit rippled - hope the riveting will pull it in straight |
||