Date:    5-19-2018
Number of Hours:    3.00
Brief Description:    Flap Brace
Riveted the flap brace into position.

Drilled out several holes to allow the pitot tubing to be routed. Found out I couldn't reach four of the holes. I had to order a 12" 3/8" drill bit to reach the tubing holes.

Installed the bushings where I was able.