| Date: |
4-26-2018 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Aileron Gap Fairings |
|
|
Squeezed the rivets on the spar for the left and right gap fairings. I had to use a pop rivet for the very last outboard rivets. Couldn't get the head of the squeezer around the outboard bracket. |
||