Date:    4-26-2018
Number of Hours:    2.00
Brief Description:    Aileron Gap Fairings
Squeezed the rivets on the spar for the left and right gap fairings. I had to use a pop rivet for the very last outboard rivets. Couldn't get the head of the squeezer around the outboard bracket.