Date:    11-20-2014
Number of Hours:    1.50
Brief Description:    Flaps - Match Drilling
Match drilled the flaps. I made shims to fit under between the outboard/inboard ribs and skins. The outboards fit with just one spacer but two will be needed on the inboard skins. Cut the shims, deburred, clamped and drilled them.