| Date: |
6-29-2014 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Wing - Installed Leading Edges |
|
|
Installed the leading edges, ran the wires into the wing, Cleco'ed everything into place. I started to fit the rivets to the spar and realized I really needed an offset rivet shank to drive them properly so I ordered those. Death by 1000 little tools needed. Getting really hot out. I am having to plan all my work around the outside temperature now. It's gonna be this way until October. |
||