| Date: |
9-19-2020 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Longerons/Drilling II |
|
|
Drilled the rest of the upper longeron and match drilled the middle and lower longerons and the rest of the holes in the F-824 as well as the skins on the bottom. |
||