| Date: |
9-7-2020 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Longeron Bending III |
|
|
After some head scratching I loosened everything up and then started re-clecoing the skins from the bottom up one row at a time. That way everything popped into place and I was able to get the longerons snug up against the bulkheads and gear towers. I had cleco'ed stabilizer attach bar in place which I had to remove. I was a little bit panicked that it went past the end of the fuselage until I read the instruction about having to trim it. |
||