Date:    8-29-2020
Number of Hours:    3.00
Brief Description:    Fuselage
Placed the forward section of the fuselage onto sawhorses after moving the wing stand over in the garage.

Prepared and match drilled the baggage floor ribs and the rudder bellcrank bracket.