| Date: |
8-25-2020 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Aft Fuselage |
|
|
Assembled the baggage floor ribs, the seatbelt attachments, and the mid/lower longerons. Drilled, deburred, cleaned, and prepped the parts. |
||