| Date: |
2-17-2020 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Center Section |
|
|
Attached the F-804 bulkheads to the center spar, match drilled the #30 holes using the bolts to true the alignment. Clamped and match drilled the F-849 control mount. Attached the seat ramp supports, match drilled, removed, and countersank the nutplate attachment holes. |
||