Date:    2-17-2020
Number of Hours:    4.00
Brief Description:    Center Section
Attached the F-804 bulkheads to the center spar, match drilled the #30 holes using the bolts to true the alignment. Clamped and match drilled the F-849 control mount. Attached the seat ramp supports, match drilled, removed, and countersank the nutplate attachment holes.