| Date: |
1-11-2015 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Fuel Tanks - Left ribs and brackets |
|
|
Started with the z brackets, marking, punching, then drilling the #30 center hole. Cut the L angle to length, then measured and marked the part for cutting. Separated and straightened the ribs using the fluting pliers. |
||