| Date: |
10-5-2013 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Left Tank Riveting |
|
|
Rivetted the top skin of the left wing tank. Was very slow going removing a cleco, cleaning the hole, applying sealant, taping, and then riveting. Had a heck of a time getting everything organized and working correctly, It was 90 degrees so by the end of the afternoon I had soaked through two shirts and ended up having to drape the tank i n towels to avoid dripping all over it. |
||