| Date: |
2-4-2012 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Finished Trim Tab |
|
|
Finished the trim tab. Back riveted in the bottom of the spar, then riveted the side tabs, and finally the hinge. I managed to badly mangle one of the lugs with the bucking bar when I was riveting the hinge on. I had to cut it off as it was too badly squished to save. |
||