Date:    4-20-2011
Number of Hours:    1.00
Brief Description:    Vertical Stabilizer
Cleco the VS-1015 Front spar doubler to aft side of the VS-1002 front spar.
Match drill will #30 drill

Dimple bottom 4 holes

Cut Rudder stops and debur

Cleco Rudder stops to Top Rudder Hinge as shown in plans. Match drill with #30 bit.