| Date: |
4-16-2011 |
|
| Number of Hours: |
6.50 |
|
| Brief Description: |
Vertical Stabilizer |
|
|
Clamped left and right spar caps into place before drilling after trimming and deburring. (Image 1) Match drilled spar caps clecoed (Image 2) Drilling and clecoing the spar caps to flange side (Image 3) |
||