| Date: |
1-19-2018 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Dimple Vertical Stabilizer |
|
|
Dimpled required Vertical Stabilizer Spar #30 holes. Drille lower hinge bracket holes per drawing 27A and deburred and dimpled fwd side of Spar. Marked holes on Vertical Stabilizer doubler that need to be countersunk. |
||