| Date: |
1-6-2018 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Deburred vertical stabilizer ribs, doubler & spars |
|
|
Deburred the vertical stabilizer doubler, ribs, forward, and aft spars. Used 3m cut and polish wheel chucked in driff press for most edges. The ligtening holes I used a smaller 3 m wheel in a die grinder. The rivet holes I deburred with a deburring tool. |
||