| Date: |
9-12-2013 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Rear Spars and Main Block Enhancement |
|
|
Started working again on left rear spar. Sonex sent me a replacement piece at their expense due to an error in their laser matched holes. The picture below shows a 5/16" bolt installed where the 1/4" bolt used to be. I made this change after contacting Sonex with the concern that the aluminum angle had a slightly ovaled hole, as shown in the second picture. The plans call for a tight fit bolt hole, and Sonex agreed that the hole should be upsized. Now I REALLY feel like the main spars are complete, with no regrets, or second thoughts about their quality, and strength. |
||