| Date: |
4-2-2013 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Drilling 1st Attach Block Assembly |
|
|
I'm still waiting for my new "D" drill and 0.2470 reamer. In the mean time I thought I'd try to at least start the assembly. I made the spacers out of the metal provided and clamped it and the angle to the attach block. I updrilled both holes on the piece shown to the dull "D" bit. Now I really need to get the new drill and reamer to finish this piece because I won't be unclamping it until the holes are sized for the bolt. |
||