| Date: |
5-6-2012 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Elevator Dimpling and Priming |
|
|
Finished Dimpling the Elevators, and their ribs. Still have to dimple the root ribs, but their position will be determined when the elevators are connected to the horizontal stabilizer hinge. |
||