Date:    1-21-2019
Number of Hours:    3.90
Brief Description:    Instrument panel layout, fabric frame
Made a run to Staples to have rev A of the panel plan printed out.

Fabricated the frame that will be used to evaluate the Stewart's System material and paint.

Added the drain valves to the compressed air "labyrinth"/.

Glued on the panel template.

All in all a pretty good day if I do say so myself.