| Date: |
1-21-2019 |
|
| Number of Hours: |
3.90 |
|
| Brief Description: |
Instrument panel layout, fabric frame |
|
|
Made a run to Staples to have rev A of the panel plan printed out. Fabricated the frame that will be used to evaluate the Stewart's System material and paint. Added the drain valves to the compressed air "labyrinth"/. Glued on the panel template. All in all a pretty good day if I do say so myself. |
||