Date:    8-2-2019
Number of Hours:    3.90
Brief Description:    Closed off the leg fairings
After way too much thinking I decided to close off the gaps at the ends of the fairings on the landing gear. I saw the difference between those that were closed off and those not while at Oshkosh and decided the time needed to do the job was worth it. It is a nit and I'll bet only owners will ever notice the difference but . . . . .

Also discovered that I had NOT put the last coat of UV paint on the rudder so I prepped it as well.