Date:    6-11-2019
Number of Hours:    5.90
Brief Description:    Added reinforcement support to gear leg ribs
Added reinforcement support to gear leg ribs.

Epoxied in place the fairings on the left gear leg.

Cut fabric to size in preparation for covering the gear legs.

Measured the planned paint booth workspace. (Not included in production hour tally.)