Date:    6-8-2019
Number of Hours:    2.20
Brief Description:    Finished the left wing panel
Completed the required touch up work on the left wing panel and ironed the pinked edges.

Made a metal template and melted in the drain holes.

Uncovered and cleared the flaperon bracket mounting holes.