| Date: |
5-19-2019 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Right wing is complete |
|
|
Finshed gluing and ironing the second tape pinked edges. Also glued the previously installed inspection rings. Prepped the shop for moving out the completed right wing and bringing the left wing in for covering. |
||