| Date: |
4-24-2019 |
|
| Number of Hours: |
2.90 |
|
| Brief Description: |
Completed covering the rudder |
|
|
Finished covering the rudder and shrunk both sides to 250 degrees F. Laid out templates for the control horn reinforcing dollies; cut them to size and installed both. Shrunk both sides to the final temperature. |
||