Date:    4-18-2019
Number of Hours:    2.50
Brief Description:    Completed HS and prepped the elevator
Added the finishing tape to the leading edge of the HS>

Prepped the elevator for covering.

Did the third inspection on the fuselage for tape that needed a bit of ironing and removed glue drips and runs.