Date:    3-18-2019
Number of Hours:    2.10
Brief Description:    Cut and installed grommets
Layed out the grommets on the fully shrunk panel (light weight fabric).

Cut out and installed the grommets shown in image 2 (plus the ones at the lift strut attach point), both sides.

BTW - I made templates for all of the grommets; contact me if you can use a copy of them. I can send them in one CAD file or individual PDF files.