| Date: |
3-16-2019 |
|
| Number of Hours: |
4.50 |
|
| Brief Description: |
Covered the vertical stabilizer |
|
|
Installed the chaffing tape, left side of VS ribs. Installed and shrunk the left side VS fabric. Installed the right side VS fabric. |
||