Date:    12-13-2018
Number of Hours:    1.50
Brief Description:    Prepped parts for tail wheel installation
Prepped the tail wheel components. The leaf springs took a bit of time because I had to remove with a Scotchbrite wheel a small amount of material on the edges to be able to fit them between the mounting bolts/collars.