| Date: |
6-3-2020 |
|
| Number of Hours: |
4.90 |
|
| Brief Description: |
Installed the fuel lines |
|
|
Fabricated the fuel quantity sight panels. Installed the wing to header tank fuel lines. Installed the vent line between the right tank and the header tank. |
||