Date:    11-18-2019
Number of Hours:    7.00
Brief Description:    Installed rear window, transponder, header tank
Rough finished the correction on the top cowl, installed the rear, starboard window, installed the transponder and the header tank. Because I had forgotten to cut the hole for the header tank drain port I cut the hole, bonded the outer flange to the skin and fabricated an annular ring that was mounted on the outside and screwed to the flange.

Began installing the turtledeck.