| Date: |
1-9-2019 |
|
| Number of Hours: |
5.70 |
|
| Brief Description: |
Continued setting control stops |
|
|
Set up the elevator up and down control stops. Torqued all jam nuts and applied proof lacquer. Removed the HT and elevator. Installed the communication di-pole antenna. Rerouted the trim drive motor wiring - moved to a port fuselage position to better avoid control linkages and antennas that may cause some level of interference between the wiring. |
||