| Date: |
1-8-2019 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Begn setting control linkages |
|
|
Began making the initial control settings. Started with getting the rudder push/pull rod linkages set and fabricated a jig to hold my cell phone (to be used as a level when setting control stops). |
||