| Date: |
5-13-2018 |
|
| Number of Hours: |
5.20 |
|
| Brief Description: |
Prepared pedal assembly components |
|
|
Performed the required modifications to the standard pedal pulley mounting control horns IAW the adjustable option. Fabricated the cable restraining straps. The above work took a little longer than normal due to solving an interference issue between one of the rudder cable pulleys and its mounting horn (misaligned mounting holes). |
||