| Date: |
5-2-2018 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Cont'd making control linkage assemblies |
|
|
Asembled elevator connect tube, mated aileron and flap bellcranks, fabricated and installed clevis pin restrining straps (joins aileron and flap bellcranks). Assembled and installed the elevator idler bellcrank. |
||