Date:    5-2-2018
Number of Hours:    1.50
Brief Description:    Cont'd making control linkage assemblies
Asembled elevator connect tube, mated aileron and flap bellcranks, fabricated and installed clevis pin restrining straps (joins aileron and flap bellcranks).

Assembled and installed the elevator idler bellcrank.