| Date: |
5-24-2020 |
|
| Number of Hours: |
5.10 |
|
| Brief Description: |
Installation of aero fairings on lift struts |
|
|
Continued installation of the aero fairings on the lift struts. Was able to get them epoxied in place - hopefully will add the balsa wood close out in the aft struts tomorrow. Installed the close outs. |
||