Date:    5-3-2020
Number of Hours:    2.50
Brief Description:    Mounted the engine heater
Decided to add a third leg on the flange the shore power connector mount to - layed it out, fabricated, and installed it.

Routed the electrical lines for the heater.

Completed the clamp for the electrical connection to shore power.