| Date: |
5-3-2020 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Mounted the engine heater |
|
|
Decided to add a third leg on the flange the shore power connector mount to - layed it out, fabricated, and installed it. Routed the electrical lines for the heater. Completed the clamp for the electrical connection to shore power. |
||