| Date: |
4-16-2020 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Painted various, installed baggage flange |
|
|
Prepped and primered the small parts (inspection plates, close outs, side panels, etc.) Drilled the propeller bolt heads for safety wire. Installed the baggage bag mounting flanges. |
||