| Date: |
1-22-2020 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Began wiring the engine to the panel |
|
|
Installed the instrument panel shelf Installed the starboard carburetor. Installed the EGT leads. Was suspicious that after a 24 hour stabilization period I could get a few bubbles out of the brake lines and bring the reservoir to the correct level by making one more pass through the bleeding process. It happened . . . . a few migrant bubbles were discovered in the left pedal lines and the reservoir was topped of. |
||