| Date: |
1-14-2020 |
|
| Number of Hours: |
6.10 |
|
| Brief Description: |
Various under the cowl |
|
|
Finished installing the oil tank vent tube (fabricated and installed the required hard mount attachments). Fabricated and install a closeout that covers two gaping holes in the panel between the radiators. Discovered that where I had located the radiator hose(s) on the pilot's side were "no bueno" when it tried to install the port carburator. All was removed and about 2 hours were spent redesigning a new approach. Started to install the fuel system and discovered the kit furnished bulkhead connector was not the size of the hose supplied with the engine. Tomorrow has to be a better day. |
||