| Date: |
11-26-2019 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Installed the oil tank |
|
|
Installed the oil tank and prepped the cowl flange (Sand and cleaned) and windshield for two more layers of glass cloth (installed saran wrap). |
||