| Date: |
8-26-2019 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Prepped for EkoBond and finished sanding |
|
|
Finished sanding the wing panel. Found one spot, about 1 inch in diameter, in which the paint lifted. Called the paint factory and determined a rework process that appears to have done the trick. Prepped the fuselage (cleaned and washed) for EkoBond. |
||