| Date: |
12-2-2018 |
|
| Number of Hours: |
4.50 |
|
| Brief Description: |
Completed pitot tube install and installed the mag |
|
|
Filled any voids that occurred during the installation of the trailing edge strengthening tubes and added filets to ensure a good bond. After buying the stainless steel screws that will be used to mount the pitot tube, performed a final fit check and then epoxied the base in place. Also, epoxied the magnetometer mounting base in place as well. |
||