Date:    12-2-2018
Number of Hours:    4.50
Brief Description:    Completed pitot tube install and installed the mag
Filled any voids that occurred during the installation of the trailing edge strengthening tubes and added filets to ensure a good bond.

After buying the stainless steel screws that will be used to mount the pitot tube, performed a final fit check and then epoxied the base in place.

Also, epoxied the magnetometer mounting base in place as well.