| Date: |
11-28-2018 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Removed flaperons and started magnetometer install |
|
|
Removed the flaperons and started work on installing the magnetometer. It will fit in the outboard bay of the right wing and I can get to it after remiving the wing tip to remove and re-install it if necessary. Didn't do a real good job of thinking thru the design or the steps needed to build it efficiently so (after redoing some features) it took a while longer than antiicipated. So goes the creative process - at least in my shop. Some days are diamonds, some are stone. |
||