| Date: |
11-20-2018 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Began flaperon belcrank assembly |
|
|
De-taped and inspected the final epoxy on the mass balance weights and the pitot tube. Built the flaperon mounting jigs. Began fitting the drive arm belcranks to the flaperons; "shims" installed. |
||